How it works

Twin first, then live

No policy reaches a live cell until it has flown thousands of simulated days and held every bound you set.

Flight plan
CAL
Calibrate the twin
TRN
Train the agents
GATE
Pass the safety gate
ENG
Engage at the edge
MON
Monitor and recalibrate

Phases

Five phases, with example timing

  1. CAL

    Calibrate the twin

    We read your PM, CM, energy and MDT exports. Twinix tunes a ray-traced model until simulated KPIs match live ones within an agreed tolerance.

    Weeks 1–4

  2. TRN

    Train the agents

    Voltari learns sleep, carrier, power and MIMO. Cellix learns beams, load and neighbours. Both train on your peaks, storms and stadium nights.

    Weeks 3–6, then continuous

  3. GATE

    Pass the safety gate

    Each policy replays a quarter of your traffic. One broken bound fails it, and Senova shows where.

    Every release

  4. ENG

    Engage at the edge

    Canary sites, then a cluster, then the region. Bounds checked before every action; one-step rollback.

    Canary for two weeks minimum

  5. MON

    Monitor and recalibrate

    Every action is logged. Senova reports savings against a counterfactual baseline.

    Continuous

Responsibility

Who does what

TaskYour teamRanpilot
Set QoS and SLA boundsOwns and signs offProposes defaults
Approve each policyApproves or rejectsPresents gate results
Rollout and rollbackPicks canaries, can roll backOperates Edgora
Report savingsAgrees the baselineProduces the report

Configuration

Your bounds, written down

bounds.yaml · example
# bounds a NOC signs off, per region · example
region: "metro-12"
bounds:
  latency_p95_ms: 20
  drop_rate_max: "0.5%"
  coverage_rsrp_dbm_min: -110
  never_sleep: ["tag:hospital", "tag:emergency"]
hours:
  sleep_allowed: "00:00-06:30"
on_breach: "rollback-region"

The contract between your NOC and the autopilot: what must never happen, where it may act, what to do on a breach.

Critical cells, such as hospitals, never sleep.

FAQ

Questions network teams ask

What if the twin is wrong?

We measure it. Policies are only offered where the tolerance report shows close agreement.

Can we start in advisory mode?

Yes. Senova recommends actions for engineers to apply by hand first.

Next step

Begin with calibration

Send a quarter of telemetry under NDA. Get back a tolerance report and a first savings estimate.